|
our clients |
||||||||||||||||||||
|
|
A strong client basis is the strength of any business, and at Herrington Consulting we believe that the repeat business we receive from our clients speaks volumes about the quality of our work and the consistency of the results that we deliver our customers. Below is a list of just a few of our key clients that we have worked for, and continue to work with, to provide both flood risk management advice and coastal engineering expertise. The list is not exhaustive, however, it does give a flavour of the variety of projects that we have completed and the diverse nature and skill that Herrington Consulting has to offer. - Technical advisor supporting the Council in developing a detailed flood modelling study for the Dover Midtown and town centre areas. - Coastal Change Management Area (CCMA) Assessment. This study appraised all of Dover District's cliffs liable to coastal erosion, quantified potential rates of erosion and made predictions as to the likely cliff position over the next 100 years. - Sub-consultant to Halcrow, responsible for the coastal engineering elements of the Kingsdown to Pegwell Bay Flood and Coastal Erosion Risk Management Strategy. Thanet
District Council - Download Movie Clip - Preparation of a risk assessment study for the town of Margate in Kent - Outline design of a flood and coast protection scheme for Margate, including detailed economic benefit cost analysis - Preparation of a Project Appraisal Report to support the application for a £6.5m flood defence grant for a new sea defence scheme to protect the town of Margate from coastal flooding. - Detailed numerical wave modelling study of the Margate frontage and harbour area - Production of the District's Strategic Flood Risk Assessment - Outline design and funding application for the Hythe to Folkestone Beach Management Scheme - Development of a beach management plan for the Greatstone sand dunes - Detailed 2D hydraulic modelling of the River Great Stour - Breach and flood propagation modelling of the coastal towns of Herne Bay, Whitstable, Reculver and Seasalter. - Production of the Districts Strategic Flood Risk Assessment - working in partnership with the Council's engineering team - Providing support to the Council's Engineering Manager throughout the development of the Project Appraisal Report for Eastbourne's Beach Management Plan - Post-project appraisal of the Littlestone Sea Defence scheme, wider coastal process study and recommendations on remedial works - Preparation of a Flood Risk Assessment for an Environment Agency operational depot - Flood Risk Assessments for a range of development sites in South East England Defence Estates/Ministry of Defence - Detailed assessment to inform on the risk of a breach in the coastal defences protecting the MoD's Hythe Firing Range site - Design of Hythe Ranges Intermediate Sea Defence Scheme - Design and supervision of the Hythe Ranges Emergency Works - Detailed design of the Fingrinhoe Sea Defence Improvement Scheme |